Free calculator · no sign-up

What’s not included? Write it down.

Pick your project type, set your limits, and get a clear “not included” list to paste into your next proposal or scope of work.

Updated November 9, 2026 · By Mo Arfaj, founder of Creepless

Quick answerFormula

A project exclusions list states what a project does not include, so “is this covered?” already has a written answer. This generator builds one from your project type and limits (pages, revision rounds, warranty, posts), ready to paste into your scope of work right after the deliverables.

base = revisions, approvals, third-party costs, rush, warranty
project type = website, branding, SEO, app, social, content
custom = your own lines for this client

Project Exclusions Generator

Project type

Your limits

Anything else to exclude?

How it’s built

Three layers make a complete list

A general base, a list for each project type, and anything specific to this client.

base = revisions, approvals, third-party costs, rush, warranty
project type = website, branding, SEO, app, social, content
custom = your own lines for this client
Worked example

A website with a 30-day warranty

An 8-page website, 2 revision rounds, 30-day warranty, 20 pages migrated from the old site. The generator lists 15 exclusions, from “pages beyond the 8 listed in the sitemap” to “updates and backups after launch, available as a maintenance plan”.

Every common “I thought that was included” has a line, with “quoted separately” attached.

Guide

How to write exclusions that prevent scope creep

Why exclusions matter more than deliverables

Clients read a deliverables list and fill the gaps with assumptions. “Website design” in their head includes the copy, the photos, the hosting and a few tweaks after launch. An exclusions list replaces those assumptions with written answers, so the first “can you just…” is settled by pointing to a line instead of starting a debate.

Be specific, and use numbers

“Additional work” excludes nothing in practice. “Pages beyond the 8 listed in the sitemap” or “revision rounds beyond the 2 included” makes the next request obviously extra. Use the same numbers in the deliverables and the exclusions so they read as one rule.

Name the usual surprises

Every type of project has its predictable arguments. For websites it’s copy, photos, migrations and post-launch changes. For branding it’s extra concepts, trademark checks and collateral. For SEO it’s development fixes and ranking guarantees. For social it’s ad spend and comment management. The generator includes these by default.

Frame it as a price list, not a refusal

Open with “we’re happy to quote any of these separately”. Clients don’t mind limits; they mind surprises. An exclusion with a path to yes is far easier to accept than a flat no.

Use it at kickoff, then in every reply

Read the list out at the kickoff meeting. Later, when a request lands that’s on it, reply with a short note that it’s listed as not included and attach a quick quote.

Update the list after every project

Every scope argument you have points to a missing exclusion. After each project, add the item that caused the most back-and-forth to your default list. Within a few projects, your exclusions will cover nearly every request that used to turn into free work.

Pair it with a clause

An exclusions list says what isn’t included. A scope creep clause in the contract says what happens when someone asks for it anyway: it’s quoted, approved in writing, then scheduled. Together they turn excluded requests into routine quotes rather than debates.

Step by step

How to generate your exclusions list

  1. 1

    Tick your project types

    Keep “Any project” on, then add website, branding, SEO, app, social or content.

  2. 2

    Set your limits

    Revision rounds, warranty, pages, posts and the other numbers that apply.

  3. 3

    Add anything else

    Client-specific exclusions, one per line.

  4. 4

    Review the list

    Remove anything you actually include.

  5. 5

    Paste it into your scope

    Right after the deliverables section.

  6. 6

    Read it at kickoff

    So nothing on it is a surprise later.

Questions

Project exclusions, answered

More free tools for agencies: see all calculators.

What should a project exclusions list include?

The things clients most often assume are included: extra pages or deliverables, revision rounds beyond the limit, changes after approval, content creation, third-party costs, rush work, and support after launch. Then add the items specific to your type of project.

Where do exclusions go in a scope of work?

Directly after the deliverables, so the client reads what is included and what isn’t in one place.

Can I combine project types?

Yes. Tick as many as apply, for example website and SEO. Each gets its own section in the list.

Will exclusions put clients off?

Not when they’re framed as “quoted separately”. The generated list opens with exactly that line.

Can I add my own exclusions?

Yes. Type them into the “Anything else” box, one per line, and they’re added at the end.

Is it free?

Yes, free with no sign-up. The list is generated in your browser.

Excluded work, caught automatically

Creepless checks every client request against your scope and exclusions, and flags the extras. Free for 2 clients.

Start for free